Poyrazgolu is a 48.5MW onshore wind power project. It is located in Balikesir, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2015.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 48.5 48.5 Active Balikesir, Turkey Demirer Holding; Ortadogu Energy; Ufuk Enerji Elektrik Uretim

Description

The project was developed by Demirer Holding, Ortadogu Energy and Ufuk Enerji Elektrik Uretim.

The turbines installed on the project are using Hybrid towers.

Development Status

The project is currently active. The project got commissioned in October 2015.

Contractors Involved

Poyrazgolu (Poyrazgolu- Phase I) is equipped with Enercon turbines. The phase consists of 15 turbines, each with 2.3MW nameplate capacity.

Poyrazgolu (Poyrazgolu- Phase II) is equipped with Enercon turbines. The phase consists 6 turbines.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.