Pucheng Power Plant is a 2,580MW coal fired power project. It is located in Shaanxi, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in September 1996. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Pucheng Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Shaanxi Huadian Pucheng Power Generating.

It is a Steam Turbine power plant.

Development status

The project got commissioned in September 1996.

Contractors involved

Northwest Electric Power Design Institute was selected to render engineering procurement construction services for the coal fired power project.

Pucheng Power Plant (Pucheng Power Plant Phase I Unit I) is equipped with Dongfang Turbine steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.

Pucheng Power Plant (Pucheng Power Plant Phase I Unit II) is equipped with Dongfang Turbine steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.

Pucheng Power Plant (Pucheng Power Plant Phase II Unit I) is equipped with Beijing Beizhong Steam Turbine Generator N330-17.75 / 540/540 steam turbine. The phase consists of 1 steam turbine with 330MW nameplate capacity.

Pucheng Power Plant (Pucheng Power Plant Phase II Unit II) is equipped with Beijing Beizhong Steam Turbine Generator N330-17.75 / 540/540 steam turbine. The phase consists of 1 steam turbine with 330MW nameplate capacity.

DEC Dongfang Electric Machinery supplied QFSN-360-2-20 electric generator for the Pucheng Power Plant (Pucheng Power Plant Phase I Unit I).

DEC Dongfang Electric Machinery supplied QFSN-360-2-20 electric generator for the Pucheng Power Plant (Pucheng Power Plant Phase I Unit II).

GE Power supplied T255-460 electric generator for the Pucheng Power Plant (Pucheng Power Plant Phase II Unit I).

GE Power supplied T255-460 electric generator for the Pucheng Power Plant (Pucheng Power Plant Phase II Unit II).

S.C. ICPET-Generatoare Abur supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase I Unit I).

S.C. ICPET-Generatoare Abur supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase I Unit II).

Babcock & Wilcox Beijing supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase II Unit I).

Babcock & Wilcox Beijing supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase II Unit II).

MHPS Dongfang Boiler supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase III Unit I).

MHPS Dongfang Boiler supplied steam boiler for the Pucheng Power Plant (Pucheng Power Plant Phase III Unit II).

For more details on Pucheng Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.