Puerta del Jerte Solar PV Park is a 30MW solar PV power project. It is planned in Extremadura, Spain. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 30 30 Permitting Extremadura, Spain Naturgy Renovables

Description

The project is being developed and currently owned by Naturgy Renovables. The company has a stake of 100%.

Puerta del Jerte Solar PV Park is a ground-mounted solar project which is planned over 73.21 hectares.

The project cost is expected to be around $20.761m.

The solar power project consists of 77,898 modules, each with 385W nameplate capacity.

7 inverters are likely to get installed at the project site.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.

About Naturgy Renovables

Naturgy Renovables SL (Naturgy Renovables) generates, transmits, and distributes electricity through solar energy. Naturgy Renovables headquartered in Spain.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.