Puerta Palmas Solar PV Park is a 50MW solar PV power project. It is located in Extremadura, Spain. The project is currently active. It has been developed in single phase. The project construction commenced in 2021 and subsequently entered into commercial operation in 2022.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Solar PV 50 50 Active Extremadura, Spain Enel Green Power Espana SLU

Description

The project is developed and owned by Enel Green Power Espana SLU.

Puerta Palmas Solar PV Park is a ground-mounted solar project which is spread over an area of 135.22 hectares.

The project cost is $36m.

The project consists of 141,750 modules, each with 340W nameplate capacity.

14 inverters have been installed at the project site.

Development Status

The project construction commenced in 2021 and subsequently entered into commercial operation in 2022.

Contractors Involved

The project is utilising trackers supplied by Soltec Power Holdings.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.