Ryburg-Schworstadt is a 120MW hydro power project. It is located on Rhine river/basin in Switzerland. The project is currently active. It has been developed in single phase. The project construction commenced in 1927 and subsequently entered into commercial operation in 1930.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 120 | 120 | – | Active | Switzerland |
---|
Description
EnBW Energie Baden-Wurttemberg, Alpiq Holding and Axpo Power are currently owning the project having ownership stake of 25%, 13.5% and 13.5% respectively.
Ryburg-Schworstadt is a run-of-river project. Ryburg-Schworstadt underwent through rehabilitation & modernization during 2010-2011. The project generated 760 GWh of electricity.
The hydro power project consists of 4 turbines, each with 30MW nameplate capacity.
Development Status
The project construction commenced in 1927 and subsequently entered into commercial operation in 1930.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.