Sant Adria de Besos Waste To Energy Project is a 31.75MW biopower project. It is located in Catalonia, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2014.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 31.75 31.75 Active Catalonia, Spain

Description

The project cost is $28.049m.

Refuse which is a kind of municipal solid waste is used as a feedstock to power the project.

Development Status

The project got commissioned in 2014.

Contractors Involved

Hitachi Zosen Inova was selected as the steam turbine supplier for the project. The company supplied Extraction-condensation turbine model turbines for the project.

Hitachi Zosen Inova supplied steam boiler for the project. The boiler installed at the site has a capacity of 49.8TPH. The temperature witnessed inside the boiler is around 400°C. The steam is pressurized inside the boiler at 40bar.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.