SELCHP Plant is a 31MW biopower project. It is located in the UK. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1994.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 31 | 31 | – | Active | the UK | Martin Engineering |
---|
Description
The project was developed by Martin Engineering. Onyx Selchp and iCON Infrastructure are currently owning the project having ownership stake of 51.25% and 48.75% respectively.
The project supplies enough clean energy to power 48,000 households.
Refuse which is a kind of municipal solid waste is used as a feedstock to power the project.
Development Status
The project got commissioned in 1994.
Contractors Involved
ABB was selected as the steam turbine supplier for the project. The company provided 1 turbine with 31MW nameplate capacity.
Steinmuller Engineering supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.