Shinboryeong Power Plant is a 2,000MW coal fired power project. It is located in South Chungcheong, South Korea. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2017.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,000 2,000 Active South Chungcheong, South Korea

Description

The project is currently owned by Korea Midland Power.

It is a steam turbine power plant.

The project cost is $2,424.15m.

Development Status

The project got commissioned in June 2017.

Contractors Involved

KEPCO Engineering and Construction was selected to render EPC services for the coal fired power project.

Doosan Heavy Industries & Construction was selected as the turbine supplier for the Coal fired project.

Doosan Heavy Industries & Construction supplied electric generator for the project.

Doosan Heavy Industries & Construction supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.