Shoaiba Power Plant is a 5,600MW oil fired power project. It is located in Makkah, Saudi Arabia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Shoaiba Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Saudi Electricity with a stake of 100%.

It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is crude oil. In case of shortage of crude oil the plant can also run on Heavy Fuel Oil.

Contractors involved

Archirodon Group was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage I) project. Archirodon Group was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage II) project. Archirodon Group was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage III) project. GE Power was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage I) project. GE Power was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage II) project. GE Power was selected to render engineering procurement construction services for the Shoaiba Power Plant (Shoaiba Power Plant Stage III) project.

Shoaiba Power Plant (Shoaiba Power Plant Stage I) is equipped with GE Power steam turbines. The phase consists of 5 steam turbines, each with 400MW nameplate capacity.

Shoaiba Power Plant (Shoaiba Power Plant Stage II) is equipped with GE Power steam turbines. The phase consists of 6 steam turbines, each with 400MW nameplate capacity.

Shoaiba Power Plant (Shoaiba Power Plant Stage III) is equipped with GE Power STF40 steam turbines. The phase consists of 3 steam turbines with 400MW nameplate capacity.

GE Power supplied electric generator for the Shoaiba Power Plant (Shoaiba Power Plant Stage I).

GE Power supplied electric generator for the Shoaiba Power Plant (Shoaiba Power Plant Stage II).

GE Power supplied GIGATOP 2-Pole electric generator for the Shoaiba Power Plant (Shoaiba Power Plant Stage III).

GE Power supplied steam boiler for the Shoaiba Power Plant (Shoaiba Power Plant Stage I).

GE Power supplied steam boiler for the Shoaiba Power Plant (Shoaiba Power Plant Stage II).

GE Power supplied steam boiler for the Shoaiba Power Plant (Shoaiba Power Plant Stage III).

Gulf Power International is the O&M contractor for thermal power project. The operation and maintenance contract commenced from 2005, for a period of 10 years.

For more details on Shoaiba Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.