Smolenskaya GRES Power Plant, Russia

By Carmen

Smolenskaya GRES Power Plant is a 630MW gas fired power project. It is located in Smolensk, Russia. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1970 and subsequently entered into commercial operation in January 1978.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 630 630 Active Smolensk, Russia

Description

The project is currently owned by Unipro with a stake of 100%.

It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Lignite.

The project generated 1,500,000MWh of electricity.

Development Status

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

The project construction commenced in 1970 and subsequently entered into commercial operation in January 1978.

Contractors Involved

Leningradsky Metallichesky Zavod was selected as the turbine supplier for thermal power project. The project consists of 3 units of K-210-130 turbines, each with 210MW nameplate capacity.

Electrotyazhmash supplied TGV-200-2M electric generator for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit I).

Electrotyazhmash supplied TGV-200M electric generator for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit II).

Electrotyazhmash supplied TGV-200-2M electric generator for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit III).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit I).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit II).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Smolenskaya GRES Power Plant (Smolenskaya GRES Power Plant Unit III).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU