Song Bung Phase 5 is a 57MW hydro power project. It is located on Bung river/basin in Quang Nam, Vietnam. The project is currently active. It has been developed in single phase. The project construction commenced in 2010 and subsequently entered into commercial operation in 2012.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 57 57 Active Quang Nam, Vietnam Power Engineering Consulting 1 Joint Stock

Description

The project is developed and owned by Power Engineering Consulting 1 Joint Stock.

Song Bung Phase 5 is a reservoir based project. The net head of the project is 27m. The project generated 230 GWh of electricity. The project cost is $62.179m.

The hydro power project consists of 2 turbines, each with 29.484MW nameplate capacity.

The project has 2 electric generators installed at the site. The generator capacity is 28.5 MVA.

Development Status

The project construction commenced in 2010 and subsequently entered into commercial operation in 2012.

About Power Engineering Consulting 1 Joint Stock

Power Engineering Consulting Joint Stock Company 1 (PECC1), formerly Power Engineering Consulting Company 1, a subsidiary of Vietnam Electricity, is a power company that offers engineering consulting services. The company offers engineering advisory services such as construction, design, feasibility studies, pre-project surveys, investment and project management, testing, and others. It offers construction projects in hydropower, substation, thermal power, and power line sectors. The company’s projects include Thai Binh Thermal Power Plant Project, Lai Chau HPP, Song Bung 4 HPP, Tuyen Quang hydropower project, and Ban Ve hydropower project, among others. It offers its services to power, civil, industrial, irrigation, and other sectors. PECC1 is headquartered in Hanoi, Ha Noi, Vietnam.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.