Suape II Power Plant is a 380MW oil fired power project. It is located in Pernambuco, Brazil. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in January 2013.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 380 | 380 | – | Active | Pernambuco, Brazil |
---|
Description
The project is currently owned by Energetica Suape II with a stake of 100%.
It is a Internal Combustion power plant.
The project cost is $335.825m.
Development Status
The project got commissioned in January 2013.
Contractors Involved
Wartsila was selected to render EPC services for the oil fired power project.
Wartsila was selected as the engine supplier for the Oil fired project. The company provided 17 units of 46F engines, each with 22.353MW nameplate capacity.
Wartsila supplied 20V electric generator for the project.
Wartsila is the O&M contractor for thermal power project. The operation and maintenance contract commenced from 2012, for a period of 3 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.