Tenzan is a 600MW hydro power project. It is located on Tenzan, Kyuragi river/basin in Saga, Japan. The project is currently active. It has been developed in single phase. The project construction commenced in 1978 and subsequently entered into commercial operation in 1987.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 600 | 600 | – | Active | Saga, Japan |
---|
Description
The project is currently owned by Kyushu Electric Power.
Tenzan is a pumped storage project. The hydro reservoir capacity is 32.7 million cubic meter. The net head of the project is 520m.
The hydro power project consists of 2 turbines.
Development Status
The project construction commenced in 1978 and subsequently entered into commercial operation in 1987.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.