Topcam is a 60MW hydro power project. It is located on Meletti river/basin in Ordu, Turkey. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 60 | 60 | – | Active | Ordu, Turkey |
---|
Description
The project is currently owned by Devlet su Isleri Genel Mudurlugu.
The hydro reservoir capacity is 133 million cubic meter. The project generated 199 GWh of electricity. The project cost is $172.2m.
Development Status
The project got commissioned in 2014.
Contractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 21MW nameplate capacity.
GE Renewable Energy supplied 3 electric generators for the project. The generator capacity is 24 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.