Receive our newsletter – data, insights and analysis delivered to you
  1. Market Data
January 11, 2022updated 12 Jan 2022 10:07am

Ust-Ilimsk Thermal Power Station, Russia

By Carmen

Ust-Ilimsk Thermal Power Station is a 475MW coal fired power project. It is located in Irkutsk, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1978.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 475 475 Active Irkutsk, Russia

Description

The project is currently owned by Irkutskenergo with a stake of 100%.

It is a Steam Turbine power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Fuel Oil.

Ust-Ilimsk Thermal Power Station (Ust-Ilimsk Thermal Power Station Unit II) consists of 1 steam turbine with 10MW nameplate capacity.

Development Status

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

The project got commissioned in December 1978.

Contractors Involved

Ust-Ilimsk Thermal Power Station (Ust-Ilimsk Thermal Power Station Unit I) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Ust-Ilimsk Thermal Power Station (Ust-Ilimsk Thermal Power Station Unit III) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Ust-Ilimsk Thermal Power Station (Ust-Ilimsk Thermal Power Station Unit IV) is equipped with Ural Turbine Works T 110-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Ust-Ilimsk Thermal Power Station (Ust-Ilimsk Thermal Power Station Unit V) is equipped with Ural Turbine Works steam turbine. The phase consists of 1 steam turbine with 185MW nameplate capacity.

NPO Elsib supplied TVF-60-2, TVF-120-2, Hydrogen Cooled electric generator for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU