Whiting Clean Energy Facility is a 576.8MW gas fired power project. It is located in Indiana, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in April 2002.

Wind Power Market seeing increased risk and disruption
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 576.8 | 576.8 | – | Active | Indiana, the US |
---|
Description
The project is currently owned by BP Alternative Energy North America.
It is a CCGT with Cogen power plant. The fuel is procured from NIPSCO.
The project generated 1,528,412MWh of electricity. The project cost is $250m.
Development Status
The project got commissioned in April 2002.
Contractors Involved
Duke Fluor Daniel was selected to render EPC services for the gas fired power project.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 steam turbine with 213MW nameplate capacity.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of 7F.04 gas turbines, each with 181.9MW nameplate capacity.
GE Power supplied electric generator for the project.
John Cockerill Group supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.