Wind aan de Stroom Wind Farm is a 69.8MW onshore wind power project. It is located in Antwerp, Belgium. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2015 and subsequently entered into commercial operation in July 2015.

Free Report
img

Wind Power Market seeing increased risk and disruption

The wind power market has grown at a CAGR of 14% between 2010 and 2021 to reach 830 GW by end of 2021. This has largely been possible due to favourable government policies that have provided incentives to the sector. This has led to an increase in the share of wind in the capacity mix, going from a miniscule 4% in 2010 to 10% in 2021. This is further set to rise to 15% by 2030. However, the recent commodity price increase has hit the sector hard, increasing risks for wind turbine manufacturers and project developers, and the Russia-Ukraine crisis has caused further price increase and supply chain disruption. In light of this, GlobalData has identified which countries are expected to add the majority of wind power capacity out to 2030. Get ahead and download this whitepaper for more details on the current state of the Wind Power Market.
by GlobalData
Enter your details here to receive your free Report.
Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 69.8 69.8 Active Antwerp, Belgium Wind aan de Stroom

Description

The project is developed and owned by Wind aan de Stroom. The company has a stake of 100%.

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm V) consists of 2 turbines with 3.2MW nameplate capacity.

The Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I A), has 115m high towers.

The Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I B), has 115m high towers.

The Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm II), has 115m high towers.

The Hybrid towers installed at the Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm III), site are 135m high.

Development Status

The project is currently active. The project construction commenced in 2015 and subsequently entered into commercial operation in July 2015.

Power Purchase Agreement

The power generated from the Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I A) is sold to Luminus under a power purchase agreement.

The power generated from the Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I B) is sold to Luminus under a power purchase agreement.

Contractors Involved

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I A) is equipped with Siemens Gamesa Renewable Energy SWT-3.0-113 turbines. The phase consists of 14 turbines with 3MW nameplate capacity.

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm I B) is equipped with Siemens Gamesa Renewable Energy SWT-3.0-101 turbine. The phase consists of 1 turbine with 3MW nameplate capacity.

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm II) is equipped with Siemens Gamesa Renewable Energy turbine. The phase consists of 1 turbine with 3.2MW nameplate capacity.

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm III) is equipped with Enercon E-115 / 3,000 kW turbines. The phase consists of 4 turbines with 3MW nameplate capacity.

Wind aan de Stroom Wind Farm (Wind aan de Stroom Wind Farm IV) is equipped with Siemens Gamesa Renewable Energy turbine. The phase consists of 1 turbine with 3.2MW nameplate capacity.

Enercon and Siemens Gamesa Renewable Energy were contracted to render operations & maintenance services for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

Free Report
img

Wind Power Market seeing increased risk and disruption

The wind power market has grown at a CAGR of 14% between 2010 and 2021 to reach 830 GW by end of 2021. This has largely been possible due to favourable government policies that have provided incentives to the sector. This has led to an increase in the share of wind in the capacity mix, going from a miniscule 4% in 2010 to 10% in 2021. This is further set to rise to 15% by 2030. However, the recent commodity price increase has hit the sector hard, increasing risks for wind turbine manufacturers and project developers, and the Russia-Ukraine crisis has caused further price increase and supply chain disruption. In light of this, GlobalData has identified which countries are expected to add the majority of wind power capacity out to 2030. Get ahead and download this whitepaper for more details on the current state of the Wind Power Market.
by GlobalData
Enter your details here to receive your free Report.

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU

Thank you for subscribing to Power Technology