Windpark Freren-Bardel is a 37.85MW onshore wind power project. It is located in Lower Saxony, Germany. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2017.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 37.85 37.85 Active Lower Saxony, Germany

Description

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase I), has 149m high towers.

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase II), has 149m high towers.

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase III), has 149m high towers.

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase IV), has 159m high towers.

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase V), has 149m high towers.

The Windpark Freren-Bardel (Windpark Freren-Bardel – Phase VI), has 159m high towers.

Development Status

The project is currently active. The project got commissioned in December 2017.

Contractors Involved

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase I) is equipped with Enercon E-115 / 3,000 kW turbines. The phase consists of 4 turbines with 3MW nameplate capacity.

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase II) is equipped with Enercon E-101 / 3,050 kW turbine. The phase consists of 1 turbine with 3.05MW nameplate capacity.

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase III) is equipped with Enercon E-115 / 3,000 kW turbine. The phase consists of 1 turbine with 3MW nameplate capacity.

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase IV) is equipped with Enercon E-126 EP4 / 4.2 MW turbines. The phase consists of 3 turbines with 4.2MW nameplate capacity.

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase V) is equipped with Enercon E-115 / 3,000 kW turbine. The phase consists of 1 turbine with 3MW nameplate capacity.

Windpark Freren-Bardel (Windpark Freren-Bardel – Phase VI) is equipped with Enercon E-141 EP4 / 4,200 kW turbine. The phase consists of 1 turbine with 4.2MW nameplate capacity.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.