Xinzhou Guangyu Cogeneration Plant is a 270MW coal fired power project. It is located in Shanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2008.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 270 | 270 | – | Active | Shanxi, China |
---|
Description
The project is currently owned by Shanxi Xinzhou Guangyu Power with a stake of 100%.
It is a Steam Turbine with Cogen power plant that is used for Baseload.
Development Status
The project got commissioned in 2008.
Contractors Involved
Dongfang Steam Turbine Works was selected as the turbine supplier for the Coal fired project. The company supplied Direct air-cooling Heating Condensing Steam Turbine model steam turbines for the project.
Shandong Jinan Generator Equipment Factory & Harbin Turbine supplied WX21Z-073LLT electric generator for the project.
Dongfang Boiler Group supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.