Yangcheng Power Plant, China

By Carmen

Yangcheng Power Plant is a 3,300MW coal fired power project. It is located in Shanxi, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in May 2001.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 3,300 3,300 Active Shanxi, China

Description

China Datang, Jiangsu Guoxin Investment Group and Shanxi International Electricity Group are currently owning the project having ownership stake of 41%, 30% and 29% respectively.

It is a steam turbine power plant that is used for Baseload.

Development Status

The project got commissioned in May 2001.

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

Contractors Involved

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit I) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit II) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit III) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit IV) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit V) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit VI) is equipped with Siemens SST5-5000 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit I) is equipped with Harbin Turbine N600-16.7 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit II) is equipped with Harbin Turbine N600-16.7 / 538/538 steam turbine. The phase consists of 1 steam turbine with 600MW nameplate capacity.

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit I).

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit II).

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit III).

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit IV).

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit V).

Siemens supplied Hydrogen Cooled electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit VI).

Harbin Electric Machinery supplied QFSN-600-2 electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit I).

Harbin Electric Machinery supplied QFSN-600-2 electric generator for the Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit II).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit I).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit II).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit III).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit IV).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit V).

Amec Foster Wheeler supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase I Unit VI).

Dongfang Boiler Group supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit I).

Dongfang Boiler Group supplied steam boiler for the Yangcheng Power Plant (Yangcheng Power Plant Phase II Unit II).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU