Yuzhou Power Plant is a 2,020MW coal fired power project. It is located in Henan, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2001.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,020 2,020 Active Henan, China

Description

China Datang, Henan Investment Group and Xuchang Economic and Technical Development are currently owning the project having ownership stake of 60%, 30% and 10% respectively.

It is a steam turbine power plant.

Development Status

The project got commissioned in December 2001.

Contractors Involved

Yuzhou Power Plant (Yuzhou Power Plant I Unit I) is equipped with Shanghai Turbine TC2F-980 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yuzhou Power Plant (Yuzhou Power Plant I Unit II) is equipped with Shanghai Turbine TC2F-980 steam turbine. The phase consists of 1 steam turbine with 350MW nameplate capacity.

Yuzhou Power Plant (Yuzhou Power Plant II Unit I) is equipped with Harbin Turbine CLN66025.0/600/600 steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Yuzhou Power Plant (Yuzhou Power Plant II Unit II) is equipped with Harbin Turbine CLN66025.0/600/600 steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

Shanghai Electrical Machinery Group supplied ITGB-GEN-1 electric generator for the Yuzhou Power Plant (Yuzhou Power Plant I Unit I).

Shanghai Electrical Machinery Group supplied ITGB-GEN-1 electric generator for the Yuzhou Power Plant (Yuzhou Power Plant I Unit II).

Harbin Electric Machinery supplied QFSN-660-2 electric generator for the Yuzhou Power Plant (Yuzhou Power Plant II Unit I).

Harbin Electric Machinery supplied QFSN-660-2 electric generator for the Yuzhou Power Plant (Yuzhou Power Plant II Unit II).

Harbin Boiler supplied steam boiler for the Yuzhou Power Plant (Yuzhou Power Plant I Unit I).

Harbin Boiler supplied steam boiler for the Yuzhou Power Plant (Yuzhou Power Plant I Unit II).

Shanghai Boiler Works supplied steam boiler for the Yuzhou Power Plant (Yuzhou Power Plant II Unit I).

Shanghai Boiler Works supplied steam boiler for the Yuzhou Power Plant (Yuzhou Power Plant II Unit II).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.