The Ashtabula I and II Wind Energy Project, USA

Excavation for access roads at the site began in June 2008.



  • Ashtabula Project
  • Ashtabula Project Access Road
  • Turbine Blades
  • Turbine Towers
  • Ashtabula Wind Farm
  • Turbine Tower Installations