Barh 1 and II, 3,300MW Coal-Powered Plant

The KSB group is responsible for the supply of 18 pumps to the 3,300MW Barh Power Project. The biggest pump set has a drive rating of 18,000kW and generates a discharge pressure of 320 bar.