Perth Wave Energy Project

Jack-up rig (JUP) owned and operated by Boskalis Australia installing a drilled and grouted pile mooring that will form the foundation for Stage One of the Perth Wave Energy project. Image courtesy of Carnegie Wave Energy Limited.