Bioenergia Nuble Biomass Power Plant is a 17.6MW biopower project. It is planned in Bio Bio, Chile. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 17.6 17.6 Permitting Bio Bio, Chile Planta Bio-E Nuble 1

Description

The project is being developed and currently owned by Planta Bio-E Nuble 1.

The project cost is expected to be around $64.07m.

The process of combustion will be adopted in this project to release the stored energy from the feed. Forest residue which is a kind of agricultural by-product will be used as a feedstock to power the project.

Development Status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.