DTE East China Power Plant is a 357.6MW gas fired power project. It is located in Michigan, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in June 2002.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 357.6 | 357.6 | – | Active | Michigan, the US |
---|
Description
The project is currently owned by DTE Energy Services.
It is a Gas Turbine power plant that is used for Peakload. The fuel is procured from SEMCO DTE East China Pipeline.
The project generated 293,125MWh of electricity.
The Gas fired project consists of 4 gas turbines, each with 89.4MW nameplate capacity.
Development Status
The project got commissioned in June 2002.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.