El Portillo 2 Wind Farm is an 83.6MW onshore wind power project. It is located in Aragon, Spain. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in May 2020.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 83.6 83.6 Active Aragon, Spain Alectoris Energia Sostenible 6; Atalaya Generacion Eolica; Forestalia Renovables

Description

The project was developed by Alectoris Energia Sostenible 6, Atalaya Generacion Eolica and Forestalia Renovables. The project is currently owned by Copenhagen Infrastructure Partners KS with a stake of 100%.

The project supplies enough clean energy to power 84,296 households.

The El Portillo 2 Wind Farm (El Portillo 2_Phase I), has 85m high towers.

The El Portillo 2 Wind Farm (El Portillo 2_Phase II), has 85m high towers.

Development Status

The project is currently active. The project got commissioned in May 2020.

Contractors Involved

Global Energy Services Siemsa was selected to render EPC services for the wind power project.

GE Renewable Energy was selected as the turbine supplier for the wind power project. The project consists of 22 units of 3.8-130 MW turbines, each with 3.8MW nameplate capacity.

GE Renewable Energy is the O&M contractor for the wind power project for a period of 20 years.

The rotor blades have been supplied by LM Wind Power Holding. The blade length is 130.000m.

The rotor blades have been supplied by LM Wind Power Holding. The blade length is 130.000m.

About Forestalia Renovables

Forestalia Renovables SL (Forestalia Renovables) is a renewable energy company that operates biomass and renewable energy projects. The company generates energy from renewable energy projects such as biomass, wind and photovoltaic, pellets and chips, and energy crops. It generates electricity using biomass and fuel thermal energy using chip and pellets. Forestalia Renovables also generates electricity through its wind farms. The company produces energy crops with plantations in Spain, France and Italy. It operates its biomass electricity projects in Cubillos del Sil, Monzon, Lebrija, Zaragozanas, Zeura and Erla, Spain. Forestalia Renovables is headquartered in Madrid, Spain.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.