Kryvorizka Thermal Power Plant, Ukraine

By Carmen

Kryvorizka Thermal Power Plant is a 2,925MW coal fired power project. It is located in Dnipropetrovsk, Ukraine. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1963.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 2,925 2,079 Active Dnipropetrovsk, Ukraine

Description

The project is currently owned by DTEK Energy with a stake of 100%.

It is a steam turbine with cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Natural Gas. The fuel is procured from DTEK Mine Komsomolets Donbassa PJSC.

The project generated 2,578,300MWh of electricity.

Development Status

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

The project got commissioned in 1963.

Contractors Involved

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit I) is equipped with Turboatom steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit II) is equipped with Turboatom steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit III) is equipped with Turboatom steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IV) is equipped with Turboatom steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IX) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit V) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VI) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VII) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VIII) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 282MW nameplate capacity.

Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit X) is equipped with Turboatom K-300-240 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit I).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit II).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit III).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IV).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IX).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit V).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VI).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VII).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VIII).

Electrotyazhmash supplied TGV-300 electric generator for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit X).

Podolsk Machine-Building Plant ZIO supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit I).

Podolsk Machine-Building Plant ZIO supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit II).

Podolsk Machine-Building Plant ZIO supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit III).

Podolsk Machine-Building Plant ZIO supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IV).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit IX).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit V).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VI).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VII).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit VIII).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kryvorizka Thermal Power Plant (Kryvorizka Thermal Power Plant Unit X).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU