JH Campbell Coal Fired Power Plant is a 1,560.8MW coal fired power project. It is located in Michigan, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 1962.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,560.8 | 1,560.8 | – | Active | Michigan, the US |
---|
Description
Consumers Energy, Michigan Public Power Agency and Wolverine Power Supply Cooperative are currently owning the project.
It is a steam turbine power plant that is used for Baseload. The power plant run on dual-fuel. The primary fuel being used to power the plant is subbituminous. In case of shortage of subbituminous the plant can also run on Bituminous. The fuel is procured from Wyoming, Montana.
The project generated 7,996,140MWh of electricity.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in October 1962.
Contractors Involved
JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit I) is equipped with Allis-Chalmers Power Systems steam turbine. The phase consists of 1 steam turbine with 260MW nameplate capacity.
JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit II) is equipped with Siemens Energy steam turbine. The phase consists of 1 steam turbine with 360MW nameplate capacity.
JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 830MW nameplate capacity.
GE Power supplied steam boiler for the JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit I).
Babcock & Wilcox Enterprises supplied steam boiler for the JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit II).
Amec Foster Wheeler supplied steam boiler for the JH Campbell Coal Fired Power Plant (JH Campbell Coal Fired Power Plant Unit III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.