Don Sahong is a 260MW hydro power project. It is located on Mekong river/basin in Champasak, Laos. The project is currently active. It has been developed in single phase. The project construction commenced in 2016 and subsequently entered into commercial operation in 2019.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 260 260 Active Champasak, Laos Electricite du Laos; Mega First

Description

The project is developed and owned by Electricite du Laos and Mega First. The company’s ownership stake in the project stands as 80% and 20% respectively.

Don Sahong is a run-of-river project. The net head of the project is 17m. The project generated 2,044 GWh of electricity. The project cost is $600m.

The hydro power project consists of 4 turbines, each with 65MW nameplate capacity.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project construction commenced in 2016 and subsequently entered into commercial operation in 2019.

Power Purchase Agreement

The power generated from the project is sold to Electricite du Laos under a power purchase agreement.

Contractors Involved

Sinohydro was selected to render EPC services for the hydro power project.

About Electricite du Laos

Electricite du Laos (EDL) is a state owned corporation. It owns and operates generation, transmission and distribution assets and manages electricity imports into its grids and exports from its stations.

About Mega First

Mega First Corporation Bhd (MFCB) is a diversified company. The company operates through its business divisions such as power generation, resources and property development and investment. Its power generation business builds, owns, operates, and maintains coal-fired heat and power plant. MFCB’s power plants include Shaoxing Plant, Tawau Plant and Don Sahong Hydropower project. The company’s resources business manufactures and trades calcium carbonate powder, lime based products and bricks. Its property development and investment business develop and invests in integrated townships and provides various residential and commercial buildings. The company operates in Malaysia and China. MFCB is headquartered in Petaling Jaya, Selangor, Malaysia.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.