Chenaux is a 144MW hydro power project. It is located on Ottawa river/basin in Ontario, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 1948 and subsequently entered into commercial operation in 1950.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 144 144 Active Ontario, Canada Hydro-Electric Power Commission of Ontario

Description

The project was developed by Hydro-Electric Power Commission of Ontario and is currently owned by Ontario Power Generation with a stake of 100%.

The hydro reservoir capacity is 122.7 million cubic meter.

Development Status

The project construction commenced in 1948 and subsequently entered into commercial operation in 1950.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 8 units of francis turbines.

Andritz Hydro supplied 8 electric generators for the project. The generator capacity is 17 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.