Aceca SDG Combined Cycle Power Plant is a 400MW gas fired power project. It is located in Castile-La Mancha, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in April 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 400 | 400 | – | Active | Castile-La Mancha, Spain |
---|
Description
The project is currently owned by Naturgy Energy Group with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
The project cost is $377.952m.
Development Status
The project got commissioned in April 2006.
Contractors Involved
Actividades de Construccion y Servicios, GE Power and SENER Ingenieria y Sistemas were selected to render EPC services for the gas fired power project.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of D10 steam turbine.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of PG9351 FA gas turbine.
GE Power supplied electric generator for the project.
Doosan Heavy Industries & Construction supplied steam boiler for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.