Aksu is a 51MW hydro power project. It is located on Coruh river/basin in Erzurum, Turkey. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2008 and subsequently entered into commercial operation in 2012.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 51 | 51 | – | Active | Erzurum, Turkey | Borusan EnBW Enerji Yatirimlari ve Uretim |
---|
Description
The project was developed by Borusan EnBW Enerji Yatirimlari ve Uretim and is currently owned by Calik Enerji Elektrik Uetim ve Madencilik.
Aksu is a run-of-river project.
Aksu (Aksu main) consists of 2 units of pelton turbines.
Aksu (Yedigol) consists of 2 units of pelton turbines.
Development Status
The project construction commenced in 2008 and subsequently entered into commercial operation in 2012.
Contractors Involved
Indar Electric supplied 2 electric generators for the Aksu (Aksu main). The generator capacity is 11 MVA.
Indar Electric supplied 2 electric generators for the Aksu (Yedigol). The generator capacity is 11 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.