The Al-Doura Power Plant Project is 640MW oil fired power project. It is planned in Baghdad, Iraq. The project is currently in permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2021 and is expected to enter into commercial operation in 2022.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 640 | – | 640 | Permitting | Baghdad, Iraq |
---|
Description
It is a thermal power plant.
The project cost is expected to be around $499.2m.
Development Status
The project construction is expected to commence from 2021. Subsequent to that it will enter into commercial operation by 2022.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
China CAMC Engineering and SEPCOIII Electric Power Construction are expected to render EPC services for the oil fired power project.
Al Nukhba Energy is expected to perform operations and maintenance for thermal power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.