Albarellos Grupo is a 59.2MW hydro power project. It is located on Avia river/basin in Galicia, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1972.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 59.2 | 59.2 | – | Active | Galicia, Spain | Enel Union Fenosa Renovables |
---|
Description
The project was developed by Enel Union Fenosa Renovables and is currently owned by Naturgy Energy Group with a stake of 100%.
Albarellos Grupo is a reservoir based project. The hydro reservoir capacity is 90,700 million cubic meter.
Development Status
The project got commissioned in 1972.
Power Purchase Agreement
The power generated from the project is sold to Union Fenosa Distribucion under a power purchase agreement.
Contractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 1 unit of francis turbine with 59.2MW nameplate capacity.
Siemens Energy supplied 1 electric generator for the project. The generator capacity is 74 MVA.
About Enel Union Fenosa Renovables
Enel Union Fenosa Renovables, S.A. (EUFER) is engaged in the production and sale of electricity through wind, solar, biomass combustion, cogeneration, and hydro technologies. The company operates in Spain in the states of Galicia, Andalusia, Extremadura and Castilla y Leon. In 2008, about 74% of the power production of the company was done through alternative energy sources, while 12% came from mini hydro projects, and 14% was produced from thermal sources. In all, the company has 1,200 MW of total power installed through wind farms, co-generation plants and small hydro projects. The company is jointly owned by Enel SpA and Union Fenosa, S.A. The company is headquartered in Madrid, Spain.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.