Alcazar II Solar PV Park is a 44.998MW solar PV power project. It is located in Castile-La Mancha, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in December 2019.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 44.998 | 44.998 | – | Active | Castile-La Mancha, Spain | Cobra Concesiones |
---|
Description
The project was developed by Cobra Concesiones. Galp Energia Espana and Actividades de Construccion y Servicios are currently owning the project having ownership stake of 75.01% and 24.99% respectively.
Alcazar II Solar PV Park is a ground-mounted solar project which is spread over an area of 86.76 hectares.
The project cost is $58.648m.
Development Status
The project got commissioned in December 2019.
Contractors Involved
Cobra Gestion de Infraestructuras was selected to render EPC services for the solar PV power project.
Trina Solar was selected as the supplier of the PV modules for the project. The company installed 136,242 modules at the site.
Power Electronics Espana supplied 23 inverters to the project site.
The project is utilising single axis trackers supplied by Trina Solar.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.