Alfredo Salazar (Anaco) Power Plant is a 300MW gas fired power project. It is located in Anzoategui, Venezuela. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1983.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 300 | 300 | – | Active | Anzoategui, Venezuela |
---|
Description
The project is currently owned by Corporacion Electrica Nacional with a stake of 100%.
It is a Gas Turbine power plant.
The project generated 1,160,450MWh of electricity.
Alfredo Salazar (Anaco) Power Plant (Alfredo Salazar (Anaco) Power Plant Phase II) consists of 2 gas turbines.
Development Status
The project got commissioned in 1983.
Contractors Involved
Alfredo Salazar (Anaco) Power Plant (Alfredo Salazar (Anaco) Power Plant Phase I) is equipped with GE Power gas turbines. The Gas fired phase consists 3 gas turbines.
GE Power supplied electric generator for the Alfredo Salazar (Anaco) Power Plant (Alfredo Salazar (Anaco) Power Plant Phase I).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.