Altomonte Combined Cycle Power Plant is a 764.6MW gas fired power project. It is located in Calabria, Italy. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2006.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 764.6 764.6 Active Calabria, Italy

Description

The project is currently owned by Edison with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant that is used for Baseload.

The project cost is $601.496m.

Development Status

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

The project got commissioned in 2006.

Contractors Involved

The Gas fired project have been supplied by GE Power and Toshiba Energy Systems and Solutions.

GE Power supplied electric generator for the project.

GE Power supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.