AMERI Aboadze Power Plant is a 250MW gas fired power project. It is located in Western, Ghana. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in February 2016.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 250 250 Active Western, Ghana

Description

The project is currently owned by Volta River Authority .

It is a Gas Turbine power plant. The fuel is procured from Ghana National Gas Company, Atuabo Gas.

The project cost is $420.473m.

Development Status

The project got commissioned in February 2016.

Contractors Involved

Power Projects Sanayi Insaat Ticaret Limited Sirketi was selected to render EPC services for the gas fired power project.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 10 units of TM2500+ (50 HZ) gas turbines, each with 25MW nameplate capacity.

Power Projects Sanayi Insaat Ticaret Limited Sirketi is the O&M contractor for thermal power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.