Amsteg is a 120MW hydro power project. It is located on Reuss river/basin in Uri, Switzerland. The project is currently active. It has been developed in single phase. The project commenced construction in 1993.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 120 | 120 | – | Active | Uri, Switzerland |
---|
Description
The project is currently owned by SBB Infrastruktur with a stake of 90%.
The gross head of the project is 280m. The project generated 460 GWh of electricity.
The project has 3 electric generators installed at the site. The generator capacity is 50 MVA.
Development Status
The project commenced construction in 1993.
Contractors Involved
Andritz was selected as the turbine supplier for the hydro power project. The company provided 3 units of pelton turbines.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.