Arroyito is a 128MW hydro power project. It is located on Limay river/basin in Neuquen, Argentina. The project is currently active. It has been developed in single phase. The project construction commenced in 1979 and subsequently entered into commercial operation in 1983.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 128 128 Active Neuquen, Argentina

Description

The project is currently owned by Enel Generacion El Chocon with a stake of 100%.

Arroyito is a run-of-river project. The net head of the project is 15.9m. The project generated 689 GWh of electricity.

Development Status

The project construction commenced in 1979 and subsequently entered into commercial operation in 1983.

Contractors Involved

Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 3 units of kaplan turbines, each with 42.66MW nameplate capacity.

ABB supplied 3 electric generators for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.