Avise is a 126MW hydro power project. It is located on Baltea river/basin in Aosta Valley, Italy. The project is currently active. It has been developed in single phase. The project construction commenced in 1951 and subsequently entered into commercial operation in 1954.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 126 | 126 | – | Active | Aosta Valley, Italy |
---|
Description
The project is currently owned by C.V.A.
Avise is a reservoir based project. The gross head of the project is 975.3m. The project generated 285.3 GWh of electricity.
Development Status
The project construction commenced in 1951 and subsequently entered into commercial operation in 1954.
Contractors Involved
The turbines for the hydro power project have been supplied by Addnew Hydropower Limited & Addnew Technologies and Voith Hydro Holding.
The electric generators for the project were procured from Ansaldo Energia and Voith Hydro Holding.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.