Baixa do Feijao IV is a 30MW onshore wind power project. It is located in Rio Grande do Norte, Brazil. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in May 2016.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 30 | 30 | – | Active | Rio Grande do Norte, Brazil | EDP Renovaveis Brasil |
---|
Description
The project was developed by EDP Renovaveis Brasil. The project is currently owned by China Three Gorges with a stake of 49% and EDP Renovaveis Brasil.
The project cost is $60.63m.
Development Status
The project is currently active. The project got commissioned in May 2016.
Contractors Involved
Siemens Gamesa Renewable Energy was selected as the turbine supplier for the wind power project. The company provided 15 units of G97-2.0 MW turbines, each with 2MW nameplate capacity.
Siemens Gamesa Renewable Energy is the O&M contractor for the wind power project for a period of 5 years.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.