Bandirma III is a 41.8MW onshore wind power project. It is located in Balikesir, Turkey. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2008.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Onshore 41.8 41.8 Active Balikesir, Turkey Bursa Temiz Enerji Elektrik Uretim Sanayi ve Ticaret

Description

The project was developed by Bursa Temiz Enerji Elektrik Uretim Sanayi ve Ticaret.

Development Status

The project is currently active. The project got commissioned in 2008.

Contractors Involved

Bandirma III (Bandirma III A) is equipped with Nordex N90 (2.5 MW) turbines. The phase consists of 10 turbines with 2.5MW nameplate capacity.

Bandirma III (Bandirma III B) is equipped with Nordex N117 (2.4 MW) turbines. The phase consists of 7 turbines with 2.4MW nameplate capacity.

Nordex is the O&M contractor for the Bandirma III (Bandirma III A).

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.