Banias Steam Turbine Power Plant is a 680MW gas fired power project. It is located in Tartus, Syria. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1982.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 680 | 680 | – | Active | Tartus, Syria |
---|
Description
The project is currently owned by Public Establishment for Electricity Generation and Transmission with a stake of 100%.
It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Palmyra fields.
Development Status
The project got commissioned in 1982.
Contractors Involved
Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit I) is equipped with Ansaldo Energia steam turbine. The phase consists of 1 steam turbine with 170MW nameplate capacity.
Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit II) is equipped with Ansaldo Energia steam turbine. The phase consists of 1 steam turbine with 170MW nameplate capacity.
Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit III) is equipped with Mitsubishi Heavy Industries steam turbine. The phase consists of 1 steam turbine with 170MW nameplate capacity.
Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit IV) is equipped with Mitsubishi Heavy Industries steam turbine. The phase consists of 1 steam turbine with 170MW nameplate capacity.
Ansaldo Energia supplied electric generator for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit I).
Ansaldo Energia supplied electric generator for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit II).
Mitsubishi Heavy Industries supplied electric generator for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit III).
Mitsubishi Heavy Industries supplied electric generator for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit IV).
Ansaldo Energia supplied steam boiler for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit I).
Ansaldo Energia supplied steam boiler for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit II).
Mitsubishi Heavy Industries supplied steam boiler for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit III).
Mitsubishi Heavy Industries supplied steam boiler for the Banias Steam Turbine Power Plant (Banias Steam Turbine Power Plant Unit IV).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.