The Batangas Combined Cycle Power Plant is 1,100MW gas fired power project. It is planned in Calabarzon, Philippines. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2024.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,100 | – | 1,100 | Permitting | Calabarzon, Philippines |
---|
Description
The project is co-owned by ACE Enexor and Gen X Energy, with their respective ownership stake of 50% each.
It is a combined cycle gas turbine (ccgt) power plant. The power plant can run on dual-fuel. The primary fuel being used to power the plant will be natural gas. In case of shortage of natural gas the plant will run on Hydrogen.
The project cost is expected to be around $1,083.907m.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataPost completion of the construction, the project is expected to get commissioned in 2024.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.