Beaver Combined Cycle Power Plant, US

By Carmen

Beaver Combined Cycle Power Plant is a 586.2MW gas fired power project. It is located in Oregon, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in August 1974.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 586.2 586.2 Active Oregon, the US

Description

The project is currently owned by Portland General Electric with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Kelso-Beaver Pipeline, Pacific Gas and Electric Company, Northwest Natural Gas operator.

The project generated 187,751MWh of electricity.

Development Status

Content from our partners
Green investment: What gives Scotland multiple advantages
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration

The project got commissioned in August 1974.

Contractors Involved

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit I) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit II) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit III) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit IV) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit V) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit VI) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.

Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit VII) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 176.4MW nameplate capacity.

GE Power supplied electric generator for the project.

The steam boilers for the gas fired power project have been supplied byCleaver-Brooks and GE Power.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU