Belviso is a 62MW hydro power project. It is located on Belviso, Aprica, Bondone, Caronella river/basin in Lombardy, Italy. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1947.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 62 | 62 | – | Active | Lombardy, Italy |
---|
Description
The project is currently owned by Edison with a stake of 100%.
The project generated 128.58 GWh of electricity.
The hydro power project consists of 1 turbine with 2.6MW nameplate capacity.
The hydro power project consists of 1 turbine with 33.2MW nameplate capacity.
Development Status
The project got commissioned in 1947.
Contractors Involved
The electric generators for the project were procured from Ercole Marelli Power and GE Renewable Energy.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.