Berezovskaya CCGT Power Plant is a 450MW gas fired power project. It is located in Brest, Belarus. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in March 2014.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 450 | 450 | – | Active | Brest, Belarus |
---|
Description
The project is currently owned by Brestenergo.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
The project cost is $490m.
The Gas fired project consists of 1 steam turbine with 150MW nameplate capacity.
Development Status
The project got commissioned in March 2014.
Contractors Involved
China Machinery Engineering was selected to render EPC services for the gas fired power project.
Siemens was selected as the turbine supplier for the Gas fired project. The company provided 2 units of SGT5-4000F gas turbines, each with 150MW nameplate capacity.
Siemens supplied electric generator for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.