Berezovskaya GRES Thermal Power Plant is a 2,400MW coal fired power project. It is located in Krasnoyarsk Krai, Russia. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1976 and subsequently entered into commercial operation in December 1987.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 2,400 | 2,400 | – | Active | Krasnoyarsk Krai, Russia | Unipro |
---|
Description
The project is developed and owned by Unipro. The company has a stake of 100%.
It is a steam turbine with cogen power plant. The fuel is procured from Berezovskoye Deposit Of The Kansko-Achinskiy Basin.
The project generated 6,458,000MWh of electricity.
Development Status
The project construction commenced in 1976 and subsequently entered into commercial operation in December 1987.
Contractors Involved
Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit I) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 800MW nameplate capacity.
Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit II) is equipped with Leningradsky Metallichesky Zavod steam turbine. The phase consists of 1 steam turbine with 800MW nameplate capacity.
Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit III) is equipped with Leningradsky Metallichesky Zavod K-800-240-5 steam turbine. The phase consists of 1 steam turbine with 800MW nameplate capacity.
Electrosila supplied electric generator for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit I).
Electrosila supplied electric generator for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit II).
Power Machines supplied TBB-800-2EY3 electric generator for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit III).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit I).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit II).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the Berezovskaya GRES Thermal Power Plant (Berezovskaya GRES Thermal Power Plant Unit III).
About Unipro
Unipro, a subsidiary of Uniper Russia Holding GmbH, is an energy utility, which generates and sells electricity power and capacity. The company produces power using hydro, natural gas and coal sources. It supplies electricity and capacity through the wholesale electricity and capacity markets under regulated contracts with predetermined volumes and tariffs approved by Federal Tariff Service. The company also explores for and produces energy, and trades that across various markets. Unipro operates the Yaivinskaya GRES, Surgutskaya GRES-2, Shaturskaya GRES, Berezovskaya GRES, and Smolenskaya GRES plants in European and Siberian price zones. The company is headquartered in Moscow, Russia.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.